https://www.belkin.com/p/46.5w-power-hub/P-AVC010.html
Connect

46.5W Power Hub

SKU: AVC010ttBK
4.7 out of 5 Customer Rating
$62.99
Connect
46.5W Power Hub
SKU: AVC010ttBK
4.7 out of 5 Customer Rating

Simplify your setup with a versatile power hub featuring a USB-C PD port, a USB-A port, and a HDMI port for seamless charging and display connectivity. Delivering 46.5W total power, this hub is compact and perfect for home offices, desks or entertainment setups.

$62.99
  • In Stock
Shipping
Free Standard Shipping on $75+
Free 2-Day Shipping on $125+


This product usually ships within 1-2 business days.
2-Year Warranty

When you buy on Belkin.com, we automatically register your product to confirm your warranty and simplify replacement requests.

Work, Study, and Play on a Big Screen

Power and connect your Nintendo Switch or USB-C laptop to a larger screen with our travel-ready multi-port 46.5W Power Hub. Display your game, work, class, and more in up to 4K with its HDMI 1.4 port while you access up to 46.5W of pass-through power through its USB-C port*. Includes a USB-A port to connect and charge an additional device or peripheral. It has a compact design that plugs directly into the wall for easy access and portability, giving you a one-dock solution at home or on the road.

Compact Power Hub

Easily plug your Nintendo Switch into a larger screen with our travel-ready 46.5W Power Hub.

Powered and Connected

Up to 46.5W of pass-through power to keep your laptop or Nintendo Switch powered while you connect.

Multi-Port Adapter

Plug into power and additional devices at the same time with a USB-C and USB-A port.

Display it in 4K

Connect to an external display through the HDMI 1.4 port and access up to 4K resolution at 30Hz.

At a Glance

  • 1xUSB-C PD port, 1xUSB-A 3.1 Gen 1 port, 1xHDMI 1.4 port
  • Connect a Nintendo Switch or USB-C laptop to a larger screen
  • Get up to 4K resolutions at 30Hz through the HDMI 1.4 port
  • Connect and power a compatible device with up to 46.5W of pass-through power through the USB-C port
  • Includes a USB-A port to charge and connect an additional device  
  • Compact and travel-friendly design plugs directly into an outlet 

HDMI

The Adopted Trademarks HDMI, HDMI High-Definition Multimedia Interface, HDMI trade dress and the HDMI Logos are trademarks or registered trademarks of HDMI Licensing Administrator, Inc. in the United States and other countries.

Package includes:

  •  CONNECT Power Hub